Workshop – As presented at the AALSO 2014 Symposium

April 1, 2014
Workshop – As presented at the AALSO 2014 Symposium

In the construction industry, the value engineering (VE) phase of project development typically occurs as projects move from their initial design to the construction documentation phase. Within the world of aquatic systems, we have found that many interpret value engineering exclusively as an exercise in which aspects of a project are cut to lower the bottom line cost. In reality, the true purpose of value engineering is to fundamentally improve the overall value of the project. We will discuss areas to consider which increase system function without increasing dollars spent, or decrease dollars spent without sacrificing overall system functionality.